Description
Job Summary:
This position focuses on formwork preparation, rebar placement, concrete pouring, and formwork removal for concrete structures.
Key Highlights:
1. Company with over 25 years of experience in concrete structure construction
2. Formwork preparation (traditional or modular formwork)
3. Concrete pouring using a concrete mixer truck or pump, followed by formwork removal
Company specializing in concrete structures with over 25 years of industry experience.
**Responsibilities**
----------
In this role, formwork is prepared either by the traditional method—cutting timber to size—or by using modular formwork systems.
Subsequently, rebar is placed, concrete is poured (either via concrete mixer truck or pump), and finally, formwork is removed.
**Requirements**
--------------
20-hour Occupational Risk Prevention (PRL) course specific to formwork.
**Benefits**
--------------
Salary according to the applicable collective agreement.
Pension plan for the Construction sector