




Job Summary: Prepare and install formwork, reinforcement steel, and concrete, and perform formwork removal as a First-Class Skilled Worker. Key Highlights: 1. Experience in traditional formwork and mold-based formwork 2. Proficiency in concrete pouring using a skip or pump 3. Requires a 20-hour PRL course in formwork FIRST-CLASS FORMWORKER **Responsibilities:** Prepare formwork either by cutting timber using the traditional method or by using molds. Subsequently, reinforce steel is placed, concrete is poured (using a skip or pump), and finally, formwork removal is carried out. **Requirements:** A 20-hour PRL course in formwork. **Benefits:** Salary according to the Collective Agreement, paid in 14 installments. Pension Plan for the Construction Sector Christmas Basket Salary: €32,000.00–€33,000.00 per year Benefits: * Retirement plan Work Location: On-site employment


